Detailed Inspection Report as of 2/27/2026
Carrier Information
- Canyon Pipeline Construction Inc
- 2824781
-
1148 Legacy Crossing Blvd #250
Centervill, UT 84014
Time/Location
- ORAP43450596
- OR
- OR
- 1/27/2026
- 0901
- 1050
- I. Full
- Fixed Site
- No
- No
Vehicle Information
| Unit | Type | Make | Plate State | Plate Number | VIN |
|---|---|---|---|---|---|
| 1 | Straight Truck | KENWORTH | OR | YCTU824 | 1NKZXPTX0KJ244358 |
| 2 | Full Trailer | LUCON | OR | HW03112 | 7JEPU2028SG000812 |
Carrier Violations
| Vio Code | Section | Unit | OOS | Description | Included in SMS | BASIC | Reason Not Included in SMS |
|---|---|---|---|---|---|---|---|
| 393.100B-C | 393.100(b) | 2 | Yes | Cargo - Cargo Not Secured To Prevent Leaking/Spilling/Blowing/Falling From Cmv | Yes | Vehicle Maint. | |
| 393.45D-B | 393.45(d) | 1 | No | Air Brake - Audible Air Leak At A Proper Connection | Yes | Vehicle Maint. | |
| 393.45D-B | 393.45(d) | 1 | No | Air Brake - Audible Air Leak At A Proper Connection | No | Multiple Cites |
