Detailed Inspection Report as of 1/30/2026
Carrier Information
- Foremost Pipeline Construction Co Inc
- 343065
-
386 Frontage Road
Gaston, SC 29053
Time/Location
- SC0389001244
- SC
- SC
- 12/17/2025
- 0905
- 0952
- II. Walk-Around
- Roadside
- No
- No
Vehicle Information
| Unit | Type | Make | Plate State | Plate Number | VIN |
|---|---|---|---|---|---|
| 1 | Straight Truck | FREIGHTLIN | SC | P688548 | 1FVHCYBS6CHBF8245 |
| 2 | Semi-Trailer | UNPUBLISHE | SC | 59546PT | 7JEPU2124JG000707 |
Carrier Violations
| Vio Code | Section | Unit | OOS | Description | Included in SMS | BASIC | Reason Not Included in SMS |
|---|---|---|---|---|---|---|---|
| 393.43DBMA | 393.43(d) | 2 | Yes | Brake - Breakaway Not Attached To The Towing Vehicle | Yes | Vehicle Maint. | |
| 393.75G-TAOW | 393.75(g) | 2 | Yes | Tires - All Others, Weight Carried Exceeds Tire Load Limit | Yes | Vehicle Maint. |
