Detailed Inspection Report as of 1/30/2026
Carrier Information
- Three Phase Line Construction Inc
- 635578
-
25 Main St
Farmington, NH 03835
Time/Location
- ME8678002315
- ME
- ME
- 7/21/2025
- 0519
- 0550
- I. Full
- Fixed Site
- No
- No
Vehicle Information
| Unit | Type | Make | Plate State | Plate Number | VIN |
|---|---|---|---|---|---|
| 1 | Straight Truck | FRHT | ME | 5AP295 | 3ALACWFD4LDKV5940 |
Carrier Violations
| Vio Code | Section | Unit | OOS | Description | Included in SMS | BASIC | Reason Not Included in SMS |
|---|---|---|---|---|---|---|---|
| 396.5B-L | 396.5(b) | 1 | No | Lubrication - Oil Or Grease Leak | Yes | Vehicle Maint. |
Hazardous Material
| HazMat Code | HazMat Description | Reported Quantity | Waste | Status |
|---|---|---|---|---|
| 2.1 | 2.1 FLAMMABLE GAS | No | No | A |
| 2.2 | 2.2 NONFLAMMABLE GAS | No | No | A |
