Detailed Inspection Report as of 1/30/2026
Carrier Information
- Three Phase Line Construction Inc
- 635578
-
25 Main St
Farmington, NH 03835
Time/Location
- NYD305400380
- NY
- NY
- 5/22/2024
- 0845
- 0920
- I. Full
- Fixed Site
- No
- No
Vehicle Information
| Unit | Type | Make | Plate State | Plate Number | VIN |
|---|---|---|---|---|---|
| 1 | Straight Truck | DODGE | IN | 3417902 | 3C7WRNFL9NG328912 |
Carrier Violations
| Vio Code | Section | Unit | OOS | Description | Included in SMS | BASIC | Reason Not Included in SMS |
|---|---|---|---|---|---|---|---|
| 392.8-D | 392.8 | Driver | No | Driver - Failed To Inspect /Use Emergency Equipment | Yes | Vehicle Maint. | |
| 393.95F | 393.95(f) | 1 | No | Emergency Equipment - Stopped Vehicle Warning Devices Missing Or Improper | Yes | Vehicle Maint. |
Hazardous Material
| HazMat Code | HazMat Description | Reported Quantity | Waste | Status |
|---|---|---|---|---|
| 2.1 | 2.1 FLAMMABLE GAS | No | No | A |
| 2.2 | 2.2 NONFLAMMABLE GAS | No | No | A |
| 3 | 3 FLAMMABLE | No | No | A |
