Detailed Inspection Report as of 1/30/2026
Carrier Information
- Foremost Pipeline Construction Co Inc
- 343065
-
386 Frontage Rd
Gaston, SC 29053
Time/Location
- SCC258010152
- SC
- SC
- 2/21/2024
- 0735
- 0820
- II. Walk-Around
- Roadside
- No
- No
Vehicle Information
| Unit | Type | Make | Plate State | Plate Number | VIN |
|---|---|---|---|---|---|
| 1 | Straight Truck | FORD | SC | P694498 | 1FDRF3GN0LED07888 |
| 2 | Full Trailer | HDSN | SC | PT30838 | 10HHTD1D0M1000198 |
Carrier Violations
| Vio Code | Section | Unit | OOS | Description | Included in SMS | BASIC | Reason Not Included in SMS |
|---|---|---|---|---|---|---|---|
| 393.75A3 | 393.75(a)(3) | 2 | Yes | Tire-Flat And/Or Audible Air Leak | Yes | Vehicle Maint. |
